Part L2 2006 - Case Study 1

 

Up Next

Tas Building Designer Part L2 2006 EDSL case study

Air conditioned offices over retail

Building and systems specification

U values to Part L2 standard

Glazing: low E solar control neutral

 

Heat gains: 12W/m2 lighting (400 lux)

                 10W/m2 occupants

                 25W/m2 small power

 

A/C system: Fan coils with fresh air heat recovery

Gas boilers 3 off with full load efficiency 85%

Air cooled chillers 2 off with full load COP 2.5

Fresh air supply 1.6l/s/m2

Total fan SFP 2.2W/l/s

Fresh air heat recovery efficiency 65%

Constant speed pumps