Part L2 2006 - Case Study 2

 

Back Up Next
Tas Building Designer Part L2 2006 user case study

Early concept stage design for office development

 

 

Building and systems specification

U values better Part L2 standard

Glazing: low E clear double glazingl

 

Heat gains: 12W/m2 lighting (400 lux)

                     8W/m2 occupants

                    15W/m2 small power

 

A/C system: Fan coils with fresh air heat recovery

Gas boilers with full load efficiency 86%

Air cooled chillers with full load COP 2.66

Fresh air supply 1l/s/m2

Total fan SFP 2W/l/s

Thermal wheel heat recovery efficiency 75%

Variable speed pumping